Deliverables Minimize
(click on WPx below to expand/collapse the corresponding list of deliverables)

Click here to expand contentClick here to collapse content  WP1
Del. No. Deliverable Title  Lead No. Estim PM Nat
 ure1 
Diss level2 Delivery date
Down load
planned
 actual
D1.1 ACTRIS web portal

1

4

O PU 3 1
(ongoing)
PDF
D1.2 Minutes of the project kickoff meeting

1

4

R CO 3 3 PDF
D1.3 Launch for call of TNA

2

2

O PU 4 4 PDF
D1.4 Minutes of the first official project meeting 1 12 R CO 18 18 PDF
D1.5 First TNA user report

2

4

R PU 18 20 PDF
D1.6 Minutes of the second official project meeting 1 12 R CO 34 34 PDF
D1.7 Second TNA user report 

2

4

R PU 36 38 PDF
D1.8 Minutes of the third official project meeting

1

12

R CO  48 49 PDF
D1.9 Final TNA user report

2

4

R PU 48 50 PDF
   Total 58      
Click here to expand contentClick here to collapse content  WP2
Del. No. Deliverable Title  Lead No. Estim PM Nat
 ure1 
Diss level2 Delivery date
Down load
planned
 actual
D2.1 Minutes of the first workshop

10

 11.90

 R  PU  10 10 PDF
D2.2 Report on first internal quality checks for hardware

24

19.50

 R  PU  12 12 PDF
D2.3 Web-graphic interface to access to lidar products

 1

12.00

 O  PP  18 18 ZIP
D2.4 Minutes of second workshop and presentations of the external experts

 10

13.90

 R  PU  22 22 PDF
D2.5 Report on the first IC-campaign 

 24

8.00

 R  PU  22 22 PDF
D2.6 Report on second internal quality checks for hardware

24

 18.50

R PU 24 24 PDF
D2.7 Implementation of procedures for aerosol depolarization ratio calibration and calculation 

 1

 15.00

O PP 32 32 ZIP
D2.8 Minutes of the third workshop

10

11.90

R PU 34 34 PDF
D2.9 Report on third internal quality checks for hardware

24

19.50

R PU 36 36 PDF
D2.10 Implementation of autimatic procedures for geometrical and optical aerosol layers characterization

1

 6.00

 O  PP  36 36 ZIP
D2.11 Report on the second IC-campaign 

 24

 6.30

R PU 42 44
PDF
D2.12 Development of procedures to perform quality check on both raw data and products 

24

15.50

O PP 44 46 PDF
D2.13 Minutes of the fourth workshop and presentation of the external experts   

10

13.90

 R  PU  46 46 PDF
D2.14 Report on fourth internal quality checks for hardware 

 24

20.50

R PU 46 46 PDF
   Total  192.40      
Click here to expand contentClick here to collapse content  WP3
Del. No.  Deliverable Title  Lead No. Estim PM Nat
 ure1 
Diss level2 Delivery date
Down load
planned
 actual
D3.1 Implementation of the existing EUSAAR standardization protocol for MSP

7

20.00

R PU 12 12 PDF
D3.2 On-site intercomparison against the EUSAAR reference MSP (maximum
once per station)

7

12.00

R PP 12 12 PDF
D3.3 Implementation of the existing EUSAAR standardization protocol for 3w-Neph and 1-w-AP

7

18.00

R PU 12 12 PDF
D3.4 On-site intercomparison of against the reference 3w-Neph and/or 1-w-AP (maximum once per station)

7

12.00

R PP 12 12 PDF
D3.5 Stringent intercomparisons for OC, EC and TC based on well defined reference material

17

8.00

R PP 12 12 PDF
D3.6  Expert workshop for CCN measurements

6

5.00

R PU 12 12 PDF

D3.7
Expert workshop for organic tracer
measurements 

12

5.00

R PU 12 12 PDF
D3.8 Intercomparison workshop for nano-MSP and AIS for the nucleation mode range

7

10.00

R PU 24 24 PDF
D3.9 On-site intercomparison against the EUSAAR reference MSP (maximum once per station)

7

12.00

R PP 24 24 PDF
D3.10 Intercomparison workshop for mw-AP

7

7.00

R PU 24 24 PDF
D3.11 On-site intercomparison of against the reference 3-w-Neph and/or 1-w-AP (maximum once per station)

7

15.00

R PP 24 24 PDF
D3.12 Stringent intercomparisons for OC, EC and TC based on well defined reference material 

17

8.00

R
PP 24 24 PDF
D3.13 Standardized protocol for CCN measurements   

6

5.00

R PU 24 24 PDF
D3.14 Standardization of the sampling and analysis of specific organic tracers

12

10.00

R PU 24 27 PDF
D3.15 On-site intercomparison against the EUSAAR reference MSP (maximum once per station)

7

12.00

R PP 36 36 PDF
D3.16 Development of a standardized protocol for mw-AP measurements

7

1.80

R PU 36 36 PDF
D3.17 On-site intercomparison of against the reference 3-w-Neph and/or 1-w-AP (maximum once per station)

7

15.00

R PP 36 50 PDF
D3.18 Stringent intercomparisons for OC, EC and TC based on well defined
reference material

17

8.00

R PP 36 36 PDF
D3.19 Implementation of organic tracer measurements at European sites

12

10.00

R PU 36 38 PDF
D3.20 On-site intercomparison against the EUSAAR reference MSP (maximum once per station)

7

12.00

R PP 48 46 PDF
D3.21 Stringent intercomparisons for OC, EC and TC based on well defined reference material

17

8.00

R PP 48 48 PDF
   Total  213.80      
Click here to expand contentClick here to collapse content  WP4
Del. No. Deliverable Title Lead No. Estim PM Nat
 ure1 
Diss level2 Delivery date
Down load
planned
 actual
D4.1 Drafts for standardised operating procedures (SOPs) for VOC measurements

8

10.00

R PU 12
12 PDF
D4.2 Drafts for standardised operating procedures (SOPs) for NOxy
measurements

18

10.00

R PU 12 12 PDF
D4.3 Results of Round Robin exercise of VOC mixtures

8

5.00

R PU 24 24
PDF
D4.4 Results of Round Robin exercise of NO

8

10.00

R PU 24 24 PDF
D4.5 Results of VOC side-by-side inter-comparison exercise of ambient air and test gases 

18

5.00

R PU 24 24 PDF
D4.6 Results of NOx side-by-side inter-comparison exercise of ambient air and test gases

18

10.00

R PU 24 24 PDF
D4.7 Results of station audits for VOCs

8

7.00

R PU 32 32 PDF
D4.8 Results of station audits for NOxy

18

8.00

R PU 32
shifted to 48
48 PDF
D4.9 Final SOPs for VOC measurements

8

8.20

R PU 42 42 PDF
D4.10 Final SOPs for NOxy measurements

18

8.20

R PU 42 42 PDF
D4.11 Link between surface and column information of VOC

27

3.00

R PU 45 45 PDF
D4.12 Link between surface and column information of NO2

27

3.00

R PU 45 45 PDF
D4.13 Recommendation on sustainability of QA and SOPs for VOC in Europe   

8

5.00

R PU 48 48 PDF
D4.14 Recommendation on sustainability of QA and SOPs for NOxy in Europe

18

5.00

R PU 48 48 PDF
   Total  97.40      
Click here to expand contentClick here to collapse content  WP5
Del. No.  Deliverable Title  Lead No. Estim PM Nat
 ure1 
Diss level2 Delivery date
Down load
planned
 actual
D5.1 Minutes of workshop for new stations

9

1.00

R PU 12 7 PDF
D5.2 Minutes of aerosol algorithm workshop

7

1.00

R PU 12 7 PDF
D5.3 Workshop with modellers on variables needed

9

1.00

P PU 15 15 PDF
D5.4 Joint workshop with modellers to define metrics

9

1.00

R PU 15 15 PDF
D5.5 Target Classification algorithms

9

4.00

P PU 24 24
PDF
D5.6 Establish common set of definition for
instrument errors

9

5.00

P PU 24 24 PDF
D5.7 Updated retrieval algorithms

9

8.00

D PU 36 36 PDF
D5.8 Modified software for aerosol retrievals

7

8.00

D PU  36 36 PDF
D5.9 Implementation of variational technique

9

12.00

D
PU 36 36 PDF
D5.10 Implementation of new metrics

9

10.00

D PU 48 48 PDF
   Total  51.00      
Click here to expand contentClick here to collapse content  WP6
Del. No.  Deliverable Title  Lead No. Estim PM Nat
 ure1 
Diss level2 Delivery date
Down load
planned
 actual
D6.1 NRT data check procedure in place at data center 3

4.00

O RE 6
15 PDF
D6.2 Report on steps needed to implement a sustainable network of type ESFRI 4

10.00

R PU 9 15 PDF
D6.3 Report on initial end-user consultation phase 29 2.00 R PU 12 25 PDF
D6.4 Report on definition of ACTRIS core station requirements including data stream functionalities 1

4.00

R PU 12 18 PDF
D6.5 Web interface to Higher Level products for the climate & air-pollution modelling community 29

4.00

O PU 12 23
PDF
D6.6 Comprehensive training course on techniques, outreach and integration
to improve running a network-1
4

4.00

O PU 12 19 PDF
D6.7  I Tutorial workshop during annual meeting to improve knowledge transfer within ACTRIS 4

3.00

O PU 12 19 PDF
D6.8 Data interface for chemical weather forecast system containing NRT data and climatologies 3

4.00

O RE 18 19 PDF
D6.9 Comprehensive training course on techniques, outreach and integration
to improve running a network-2
4

4.00

O PU 18 19 PDF
D6.10 Report on synergy effects in a European network integrating ACTRIS and national stations 4

2.00

R PU 18 20 PDF
D6.11 International communication on ACTRIS activities and opportunities 2

1.00

R PU 18 20 PDF
D6.12 Website for continuous end-user consultation and user request collection & traceability 3

8.00

O PU 24 24 PDF
D6.13 Comprehensive training course on techniques, outreach and integration
to improve running a network-3
4

4.00

O PU 24 24 PDF
D6.14 II Tutorial workshop during annual meeting to improve knowledge transfer within ACTRIS 4

3.00

O PU 24 30
PDF
D6.133 new
NRT data check procedure in place at data center 3   O RE 28 28 PDF
D6.15  ACTRIS core station prototype is realized 1

6.00

 D RE 36 38 PDF
D6.16 Higher level data product: Long-term trends of aerosol properties 29

7.00

O PU 36
38
(48)
PDF
D6.17 Comprehensive training course on techniques, outreach and integration
to improve running a network-4
4

4.00

O PU 36 38 PDF
D6.18 III Tutorial workshop during annual meeting to improve knowledge transfer within ACTRIS 4

3.00

O PU 36 48 PDF
D6.19 Report on the status of international associationship with ACTRIS outside the Consortium 2

3.00

R PU 38 40 PDF
D6.20 Comprehensive training course on techniques, outreach and integration
to improve running a network-5
4

4.00

O PU 40 48 PDF
D6.21 Higher level data product: Climatology of vertical distribution of key parameters over Europe 29

7.00

O PU 42
48 PDF
D6.22 Higher level data product: Radiative forcing benchmark dataset 29

7.00

O PU 42
48 PDF
D6.23 Higher level data product: Satellite & surface data integration tool 29

7.00

O PU 42
48 PDF
D6.24 Report on ACTRIS core station and recommendation to sustainable network implementation 1

4.00

R PU 48 48 PDF
D6.25 Comprehensive training course on techniques, outreach and integration
to improve running a network-6
4

4.00

R PU 48 48 PDF
D6.26 IV Tutorial workshop during annual meeting to improve knowledge transfer within ACTRIS 4

3.00

R PU 48 48 PDF
    Total   116.00      
Del.
No.
Deliverable Title
Lead No.
Estim
PM
Nat
ure1
Diss
level2
Delivery Date Down load
 planned
actual
D7.1 Transnational Access to CIAO

1

0

O PU 48 48 PDF
D8.1 Transnational Access to PAL

2

0

O PU 48 48 PDF
D9.1 Transnational Access to MAIDO

2

0

O PU 48 48 PDF
D10.1 Transnational Access to SMR

4

0

PU 48 48
PDF
D11.1 Transnational Access to CESAR

5

0

O PU 48 48 PDF
D12.1 Transnational Access to JFJ

6

0

O PU 48 48
PDF
D13.1 Transnational Access to MHD

14

0

O PU 48 48 PDF
D14.1 Transnational Access to AMO

15

0

O PU 48 48 PDF
D15.1 Transnational Access to FKL

16

0

O PU 48 48 PDF
D16.1 Transnational Access to HPB

18

0

O PU 48 48 PDF
D17.1 Transnational Access to RADO

23

0

O PU 48 48 PDF

 Total

0

  

   
Del.
No.
Deliverable Title
Lead No.
Estim
PM
Nat
ure1
Diss
level2
Delivery Date Download
 planned actual
D18.1 TNA12: Access to the AERONET-EUROPE calibration centre (LOA)

2

0

O PU 48 50 PDF
D18.2 TNA12: Access to the AERONET-EUROPE calibration centre (IZANA)

13

0

O PU 48 50 PDF
D18.3 TNA12: Access to the AERONET-EUROPE calibration centre (GOA-UVA)

28

0

O PU 48 50 PDF

 Total

0

  

   
Del.
No.
Deliverable Title
Lead No.
Estim
PM
Nat
ure1
Diss
level2
Delivery Date Download
planned
actual
D19.1 Service provision: Access to the ACTRIS data centre (EBAS)

3

0

O PU 48 50 PDF
D19.2 Service provision: Access to the ACTRIS data centre (CLOUDNET)

 9

0

O PU 48 50 PDF
D19.3 Service provision: Access to the ACTRIS data centre (EARLINET)

 11

 0

O PU 48 50 PDF

 Total

0

  

   
Del. No.  Deliverable Title  Lead No. Estim PM Nat
 ure1 
Diss level2 Delivery date
Down load
planned
 actual
D20.1 Documentation on database structure for combined lidar and sunphotometer observations

7

 2.00

R PU 9 10 PDF
D20.2 Report on evaluation of Raman lidar techniques for daytime extinction measurements

7

3.50

R PU 12 12 PDF
D20.3 First dataset of combined lidar and sunphotometer observations in five core regions

 7

15.00

O PU 24 24 PDF
D20.4 Documentation on the inversion algorithm for combined sunphotometer and multiwavelength backscatter

19

15.00

R PU 30 30 PDF
D20.5 Report on the implementation and test of optimized techniques for daytime Raman lidar observations

1

16.00

R PU 36 36 PDF
D20.6 Second dataset of combined lidar and sunphotometer observations in five core regions

7

15.00

O PU 36 36 PDF
D20.7 Documentation on the inversion algorithm for combined sunphotometer and multiwavelength Raman lidar

2

14.00

R PU 42 42 PDF
D20.8 Recommendations for the improvement of daytime lidar capabilities within the network

1

3.00

R PU 48 48 PDF
D20.9 Report on combined lidar-sunphotometer algorithms for non-spherical particles

2

10.00

R PU 48 48
PDF
   Total  93.50      
Del. No.  Deliverable Title  Lead No. Estim PM Nat
 ure1 
Diss level2 Delivery date
Down load
planned
 actual
D21.1 Definition of experimental design for mass closure experiments

8

4.00

R CO 6 7 PDF
D21.2 Report on standardized OVOC
instrument based on developed GCMS technology

8

6.00

R PU 12
shifted to 18
18 PDF
D21.3 Delivery of aerosol chemistry data to EBAS data centre

6

62.60

O RE 40
shifted to 48
48 PDF
D21.4 Delivery of OVOC data to EBAS data centre

8

12.00

O RE 42 42 PDF
D21.5 Report on mass closure experiments
performed at 2 European sites

8

24.00

R PU 45 45
update 48
PDF
D21.6 Final report on ACSM suitability for long-term measurements

6

10.00

R PU 48 48 PDF
     Total  118.60      
Del. No.  Deliverable Title  Lead No. Estim PM Nat
 ure1 
Diss level2 Delivery date
Down load
planned actual
D22.1 Documentation on existing cloud, aerosol, water vapour retrieval techniques 5 4.00 R PU 6 8 PDF
D22.2 Report on optimized and tested retrieval techniques 5 8.00 R PU 18 18 PDF
D22.3 Cloud categorization and cloud-aerosol interaction descriptors

5

10.00

O PU 24 24 PDF
D22.4 Report observation procedure for the classification of cloud-aerosol interaction

5

12.00

R PU 36 38 PDF
D22.5 Tools to identify the relation between aerosol sources and cloud-aerosol interaction

5

12.00

O PU 42 42 PDF
D22.6 Report and documentation on scaled-down observation methods for implementation at cloud profiling sites

2

10.00

R PU 48 48 PDF
     Total  56.00      
Print  
 
Submission of deliverables Minimize
Deliverables embody and promulgate the results of a project. They are specified in Annex 1 to the contract in terms of type, content, and timing. All deliverables, unless they are in themselves documents (e.g., a technical Report), must be accompanied by some descriptive documentation to explain their purpose and role within the context of the project. All deliverables should be clearly identifiable as pertaining to the project, and all contributors should be named.

Delieverables either
(1)
represent important intermediate results that other members of the project consortium are supposed to build on, or
(2) represent important results offered to the wider scientific community or public, and serving as basis for future publications.
 
The ACTRIS WP leaders are requested to provide a written document for each deliverable in a separate file. The deliverables should be prepared using the ACTRIS Deliverable template! When the deliverable is not a report, please provide any available supporting material that can document it ( e.g. photograph, URL, etc.).

Delivery date: due before the end of the respective month. In case of delays with respect to the original delivery date, please justify correspondingly and indicate  recommended actions to correct the deviation.

Dissemination level
PU = Public
RE = Restricted to a group of the specified Consortium
PP = Restricted to other program participants
        (including Commission Services)
CO= Confidential, only for members of the Consortium
        (including the Commission Services)
Nature of Deliverable
P= Prototype
R= Report
S= Specification
T= Tool
D= Demonstrator
O = Other
Print  
 